MOUSE Hotfix 20-11-2009

This hotfix implements the following changes:
1. Issue fixed with respect to generation of numeric water in computations with Pressure Mains using implicit solution
2. Correction in the MIKE FLOOD River/Urban link. The problem occurs with some setups only and results in no flow exchange between the models (MOUSE/MIKE 11)
3. Weir not initialized correctly when jumping to new job in LTS simulation

FILE INFORMATION

File nameFile size
MOUSE_2009_091120.ZIP1.6 MB

Download from US East
- If you are from North America, Latin America, Europe, the Middle East or Africa:

Download from Singapore
- If you are from the Asia-Pacific region: